MOTOR CONTROL SPECIALISTS PART IDENTIFICATION ORDER SUPPORT
UL 508A Panel Shop

Custom panelboards, built to your spec.

Configure a 3-phase panel below and send the build sheet. We build it in our own UL 508A shop and it typically ships in about a week.

  • UL 508AIn-house listed shop
  • ~1 weekTypical build & ship
  • 208–600V3-phase distribution
Build Sheet3-Phase Panelboard · UL 508A
01 System
Phase3-phase
02 Main
03 Enclosure & Brand
04 Branch Devices
QtyPolesAmpsLoad / note
9 pole positions

Send this build sheet for a quote

Typical build is about one week. We confirm price and lead time before you commit.

From spec to shipped

  1. 1

    Spec it

    Fill out the build sheet above or send us a one-line. We read part numbers and schedules fluently.

  2. 2

    We quote it

    An engineer confirms price, interrupt ratings, and lead time, usually the same day.

  3. 3

    We build it

    Assembled and wired in our in-house UL 508A shop from inventory we already stock.

  4. 4

    It ships

    Typical turnaround is about one week. Rush builds available when you are down.

Prefer to send a drawing or a one-line? Email sales@1dmi.com or call (945) 277-5614. Looking for other custom work? See custom motor starters, MCC buckets, and switchboards & switchgear.